jdenglish
Joined: | 02-11-2009 |
Location: | |
Posts: | 80 |
Status: |
Offline
|
|
The process started by making an exoskeleton of rectangular steel tubing that was welded to the outside rails to stabilize the monoque when thefloor pans were removed.
Floor pan were cut and spot welded in place. I extended a piece of heavy gauged rectangular stee tubing between the sub frames. Under coating reapplied and soon the old lump will be reinserted. Had the great luck the use of a frame lift during the process. Kids, don't try this at home! Still have scabs from learning how to weld.
|