View single post by jdenglish
 Posted: 12-04-2009 02:13 am
PM Quote Reply Full Topic
jdenglish

 

Joined: 02-11-2009
Location:  
Posts: 80
Status: 
Offline
The process started by making an exoskeleton of rectangular steel tubing that was welded to the outside rails to stabilize the monoque when thefloor pans were removed.
Floor pan were cut and spot welded in place.  I extended a piece of heavy gauged rectangular stee tubing between the sub frames.  Under coating reapplied and soon the old lump will be reinserted.  Had the great luck the use of a frame lift during the process.  Kids, don't try this at home!  Still have scabs from learning how to weld.