View single post by StevenD57
 Posted: 03-04-2013 12:36 am
PM Quote Reply Full Topic
StevenD57



Joined: 04-10-2009
Location: Hubbard, Ohio USA
Posts: 104
Status: 
Offline
The first T9 bellhousing is at the machine shop waiting for some available CNC mill time. Once we have the T9 transmission flange bolt pattern on there then the design work on the location of the clutch fork pivot can be finalized. After that comes the first trial install. I have three T9 transmissions to choose from so I am all ready to go with the last part.

Last edited on 03-04-2013 07:00 am by StevenD57